215-217 Bath Road, Slough
Skansen were appointed by Orange Business Services to provide an aesthetic and functional solution to enhance the existing meeting suite on the ground floor. The challenge was not only to create inspirational meeting space but also to incorporate a new canteen area. As a result of creative space planning and innovative design, Skansen and Edge Architecture & Design were able to provide a quality solution with a complete culture change to serving food within the office environment. The work was undertaken with the client in situ and with minimal disruption to their on going meeting requirements.
Key elements of project:
Location: Betjeman Place, 215-217 Bath Road, Slough SL1 4AA Size: 5,000sq.ft Duration: 10 weeks Design: Edge Architecture & Design
< back
|
|
Quantum Q1, Norden Road, Maidenhead SL6
Following detailed assessment of space and services requirements for a number of shortlisted buildings, Skansen have recently completed the 27,000sq.ft design and build fit out for Compuware’s new UK headquarters. A leading global provider of software products and services, projection of Compuware’s strong brand identity was key. Bespoke manifestation, use of corporate colours and thought provoking murals, integrated with quality joinery and feature ceilings, delivered the strong company image. A dedicated IT system to CAT 6A structured cabling was used throughout and energy efficient direct cabinet cooling was utilised in the comms room to deliver available power efficiencies.
Key elements of project:
Location: Quantum Q1, Norden Road Maidenhead SL6 2QL Size: 27,000sq.ft Duration: 14 weeks Design: Edge Architecture & Design
< back
|
 |
Great Pulteney Street, London W1
Skansen were appointed to deliver new headquarters office. A fully integrated design solution was developed by Skansen, which included bespoke teleconferencing facilities, meeting room suite and contemporary break out area. The project was delivered within extremely tight time constraints to meet Costar’s lease expiry deadlines.
Key elements of project:
Location: 10 Great Pulteney Street, London W1 Size: 8,000sq.ft Duration: 8 weeks Design: Artillery
< back
|
Aviva Tower, London EC3
Skansen relocated Munich Re to one of the City of London’s most prominent buildings. This fast track fit-out encompassed the integration of the company’s IT, data and audio-visual requirements as well as bespoke finishes to the reception and boardrooms. Effective tenant coordination was essential to deliver this project as the other floors in the building remained fully occupied for the duration of the works.
Key elements of project:
Location: Aviva Tower, London EC3 Size: 11,000 sq.ft. Duration: 10 weeks Design: Mansfield Monk
< back
Berkeley Square, London W1
A phased project to meet the changing requirements of ArcelorMittal. The works ranged from the refurbishment of back office space to high quality executive and meeting room suites, including state of the art AV and teleconferencing facilities.
Key elements of project:
Location: Berkeley Sq House, Berkeley Sq, London W1J 6DA Size: 48,000sq.ft Duration: 28 weeks Design: Mansfield Monk
< back
14 Northburgh Street, London EC1
Fit out to CAT B standard of furniture showroom and offices. The main challenges consisted of incorporating the client’s concept design (Gensler) within the building, whilst maintaining its integrity and ensuring all the Client’s programme requirements were met. Key features of the project included scenery lighting, custom made joinery and a suspended floating MF ceiling in the showroom.
Key elements of project:
Location: 14 Northburgh Street, London EC1V 0AV Size: 3,000sq.ft. Duration: 8 weeks Concept Design: Gensler Detailed Design: Artillery
< back
36 Leadenhall Street, London EC3
Skansen were appointed to provide a full Design & Build project coordination service for the bank’s first UK office. The project included the procurement and management of IT and communication services, together with an integrated furniture solution. An executive office suite, reception and trading floor were delivered over two floors within 8 weeks of appointment.
Key elements of project:
Location: 36 Leadenhall Street, London EC3A 1AT Size: 8,000sq.ft Duration: 6 weeks Design: Artillery
< back
Coleman Street, London EC2
Appointed by Knight Frank to develop a design solution for the relocation of their City Leasing and Investment Office on the 7th Floor at 4 Coleman Street. Key to the success of the fit out was retaining impressive views of the City.
Key elements of project:
Location: Coleman Street, London EC2 Size: 5,000sq.ft. Duration: 6 weeks Project Manager: Knight Frank Design: Canvas Creative
< back
King William Street, London EC4
The Client, a Portuguese retail and investment bank, required both retail and private client areas, executive meeting room suites and offices to be installed to a very high quality. The installation of a 24 position trading floor with the associated resilient service upgrades was key to the success of the project and detailed coordination of these services was essential to maintain the overall design ethos of the scheme.
Key elements of project:
Location: King William Street, London EC4 Size: 9,000 sq.ft. Duration: 9 weeks Design: Mansfield Monk
< back
Leadenhall Street, London EC3
To deliver the new European offices of Ogilvy Renault, Skansen ere invited to deliver a design solution which reflected old world quality in a modern design. The proposed solution developed by Skansen secured the project and delivered a minimalist environment which emphasised the traditional feature American black walnut furniture and storage units.
Key elements of project:
Location: 107 Leadenhall Street, London EC3 Size: 3,750 sq.ft. Duration: 6 weeks Design: Artillery
< back
Beadon Road, London W6
The key factor in securing this project was Skansen’s ability to deliver and cost a design solution within 2 weeks of meeting the Client. 5 weeks later, Western Union moved in to their new European headquarters, complete with contemporary furniture and bespoke corporate signage.
Key elements of project:
Location: 1 Beadon Road, London W6 Size: 5,000 sq.ft. Duration: 5 weeks Design: Frank Good
< back
|